A state school in Logan engaged our team to repaint their assembly hall during the two-week term break, presenting the challenge of completing a large-scale institutional interior within a fixed, non-negotiable deadline. The hall featured high vaulted ceilings exceeding six metres, an extensive timber stage surround, decorative ironwork, and significant wall and ceiling area requiring scaffold-tower access. Our programme commenced with surface cleaning and repair of damaged plaster, followed by systematic application of a durable, scrubbable low-sheen system in warm cream and soft white tones. All timberwork was hand-sanded and coated with a hard-wearing enamel. The facility was returned to the school fully complete, clean, and ready for assembly on the first day of term.
Start Your Project
Every transformation begins with a detailed consultation. Contact us to arrange a complimentary site assessment and receive a comprehensive fixed-price quotation tailored to your property and requirements.